Symptom
While opening a message mapping on ESR, getting the error:
"GC overhead limit exceeded (max heap: 512 MB) Refer to error logs for details "
In NWA, under Memory VM Parameter , parameter "MaxHeapSize" is already 4096
You have also implemented note ##3103535 but still getting the error.
Read more...
Environment
Product version: SAP NetWeaver 7.5
Product
SAP NetWeaver 7.5
Keywords
GC overhead limit exceeded. max heap: 512 MB , Xmx parameter ,JNLP file. , KBA , BC-XI-IBF-COR , DB - OR mapping, Server Framework, HMI, SQL layer , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview