Symptom
Error code C+730 "Execution in future period &1 / &2 is not allowed (valuation area &3)" occurs when starting the first step of the actual costing closing run (CKMLCP).
Environment
SAP S/4HANA Cloud Public Edition
Reproducing the Issue
- Navigate to the app "Edit Actual Costing Runs (CKMLCP)".
- Check the error code C+730 "Execution in future period &1 / &2 is not allowed (valuation area &3)" in the first step.
Cause
The actual costing closing run (CKMLCP) was started for a future period for one or more selected valuation areas; the selected period does not match the valuation area’s current material ledger period.
Resolution
- Verify the current material ledger period for each valuation area intended for inclusion in the CKMLCP run.
- Adjust the CKMLCP selection so that only valuation areas whose current period equals the run period are included.
- If the desired period is in the future for any valuation area, first complete closing for the current period and shift the material ledger to the next period as required.
- Rerun the first step of CKMLCP for the correct period and selection.
Keywords
CKMLCP, C+730, actual costing, material ledger period, current period, future period, valuation area, closing run, first step, period mismatch, period control, inventory accounting, cost closing, actual costing closing run , KBA , CO-PC-ACT-2CL , Actual Costing (Public Cloud) , CO-PC-ML-2CL , Material Subledger (Public Cloud) , Problem
SAP Knowledge Base Article - Public