3746084 - Error C+730 during first step of Edit Actual Costing Runs (CKMLCP) - SAP S/4HANA Cloud Public Edition

Symptom

Error code C+730 "Execution in future period &1 / &2 is not allowed (valuation area &3)" occurs when starting the first step of the actual costing closing run (CKMLCP). 

Environment

SAP S/4HANA Cloud Public Edition

Reproducing the Issue

  1. Navigate to the app "Edit Actual Costing Runs (CKMLCP)". 
  2. Check the error code C+730 "Execution in future period &1 / &2 is not allowed (valuation area &3)" in the first step. 

Cause

The actual costing closing run (CKMLCP) was started for a future period for one or more selected valuation areas; the selected period does not match the valuation area’s current material ledger period.

Resolution

  1. Verify the current material ledger period for each valuation area intended for inclusion in the CKMLCP run.
  2. Adjust the CKMLCP selection so that only valuation areas whose current period equals the run period are included.
  3. If the desired period is in the future for any valuation area, first complete closing for the current period and shift the material ledger to the next period as required.
  4. Rerun the first step of CKMLCP for the correct period and selection.

Keywords

CKMLCP, C+730, actual costing, material ledger period, current period, future period, valuation area, closing run, first step, period mismatch, period control, inventory accounting, cost closing, actual costing closing run , KBA , CO-PC-ACT-2CL , Actual Costing (Public Cloud) , CO-PC-ML-2CL , Material Subledger (Public Cloud) , Problem