SAP Knowledge Base Article - Preview

3755855 - Freight Unit Stuck in Permanent Planning Block Due to Inconsistent Stage Structure After Manual Stage Deletion in STO outbound delivery

Symptom

A Freight Unit becomes permanently planning-blocked after a manual modification of the stage structure during troubleshooting or data correction activities. In particular, deletion or removal of an intermediate route stage leads to an inconsistent or incomplete stage sequence within the Freight Unit’s transportation plan. because of this the following issues occur:

  • The Freight Unit is set to a permanent Planning Block
  • The routing / stage structure is considered inconsistent or “broken”
  • Route determination fails or cannot be re-executed successfully
  • Manual correction of the stage sequence is restricted or not possible
  • The system does not allow re-insertion of missing stages due to structural validation checks
  • The Freight Unit cannot proceed in standard planning or execution processes


Read more...

Environment

SAP S/4HANA 1709 and Higher

Product

SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025

Keywords

freight unit, incorrect destination, stage deletion, transshipment stage, planning block, no common pick-up/delivery locations, consolidation error, freight booking, sto outbound delivery, tm integration, routing, stage structure, unplan freight unit, freight order, /SCMTMS/SUBSEQUENT_FUB_LOGINT , KBA , TM-INT-LI-LE , Integration with Logistics Execution , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.