3756091 - Primary system freeze/hang during planned secondary shutdown in System Replication environment due to logshipping timeout

Symptom

  • During a disaster recovery test simulating a zone failure, a hard shutdown of the secondary HANA node caused the primary site to temporarily lose application connectivity.
  • Online calls dropped to zero for approximately one minute while the secondary was shutting down.
  • A trace file with “LogshippingTimeout” in the name was generated around the event timeframe.


Read more...

Environment

  • SAP HANA 1.0, platform edition
  • SAP HANA, platform edition 2.0

Product

SAP HANA 1.0, platform edition ; SAP HANA, platform edition 2.0

Keywords

hana system replication, synchronous, logshipping_timeout, log shipping timeout, primary freeze, application stall, dr test, secondary shutdown, commit wait, temporary hang, calls drop to zero, timeout 30-60 seconds, global.ini, system_replication parameter , KBA , HAN-DB-HA , SAP HANA High Availability (System Replication, DR, etc.) , Problem