Symptom
Equipment PRT has a measuring point and usage formula assigned but the required measurement document is not automatically generated upon production order confirmation.
Environment
SAP S/4HANA Cloud Public Edition
Reproducing the Issue
- Create an equipment PRT using the Create Technical Object app.
- Assign the equipment PRT to an operation in the routing using the Create Routing app.
- Create a production order (CO01).
- Release the production order (CO02).
- Confirm the production order (CO11N or CO15).
- Expect a measurement document to be created after confirmation.
- Check the measurement document (IK03) and observe that the measurement document is not automatically created.
Cause
Maintenance plan is missing in the PRT data of the Technical Object.
Resolution
Maintain the Maintenance Plan ID in the PRT data of the Technical Object.
See Also
Keywords
measurement document, production order confirmation, equipment prt, prt measuring point, prt usage formula, maintenance plan, usage-based maintenance, s/4hana cloud public edition, pm, pp, routing, work center formula, ik03, co11n, co15 , KBA , PM-FIO-2CL , Fiori User Interface (UI) for PM (Public Cloud) , Problem