SAP Knowledge Base Article - Preview

3773059 - Initial load stuck on “calculating access plan”. - SAP SLT

Symptom

  • Table initial load remains in status “Calculating access plan” in LTRC.
  • No error in LTRC
  • In LTRC, the table remains “In Process” without progressing.
  • The finished calculation job in the source system doesn't have any error. No more calculation job running after the finished ones.
  • Reading type 4/5 is used
  • Specify automatic ranges in LTRS -> Performance Options -> Initial Load Options -> Number of Records, which determines the number of records that are processed by one access plan.
  • Maintained IUUC_PRECALC_OBJ table to configure automatic ranges


Read more...

Environment

  • SAP Landscape Transformation Replication Server (SLT)

Product

SAP Landscape Transformation replication server 1.0 ; SAP Landscape Transformation replication server 2.0 ; SAP Landscape Transformation replication server 3.0

Keywords

ACDOCA, calculating access plan, waiting for delimitation, DHADM, DHCDCMON, ACP daemon, consumer is not available, ABAP_DAEMONS, SLT initial load, pre-calculation, calculation jobs, LTRC, ACD jobs, ACS jobs, access plan calculation , KBA , CA-LT-SLT , SAP Landscape Transformation Replication Server (SLT) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.