3780808 - Prerequisites for activating scope item 33Q (Actual Costing) in SAP S/4HANA Public Cloud

Symptom

  • Clarification needed on the activation of Scope Item 33Q (Actual Costing) in the live SAP system.
  • Need for prerequisites, dependencies, or risks before proceeding with activation.

Environment

SAP S/4HANA Cloud Public Edition

Resolution

To ensure smooth activation of 33Q , check that following customizing is complete :

  1. All valuation classes used in existing Material master are mapped to GL in GBB/VBR  (consumption account mapping via configuration 'Automatic Account Determination' (SSCUI 100297)).
  2. All GBB/VBR GL accounts are mapped to cost component structure via configuration 'Define Cost Component Structure' (SSCUI 102427).
  3. It's not prohibited but price determination should be changed to 3 (multi level) in MM after scope item 33Q actual costing activation.

Keywords

33Q, scope item 33Q, actual costing, activation, live system, sscui 100297, sscui 1024273, gbb/vbr, consumption account determination, cost component structure, price determination 3, multilevel, inventory accounting, public cloud, SAP s/4hana cloud public edition, activate 33Q, prerequisites , KBA , CO-PC-ACT-2CL , Actual Costing (Public Cloud) , Bug Filed

Product

SAP S/4HANA Cloud Public Edition all versions