Symptom
When trying to setting up a Supply Creation-Based Confirmation (SBC) scenario in a S/4HANA 2023 or older releases, the Standard Planning Procedures 6 (Characteristics Evaluation) and 7 (Length-Based Characteristics Evaluation) are not available in the system.
Read more...
Environment
- SAP S/4HANA > Production Planning and Detailed Scheduling (PP/DS)
Product
SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023
Keywords
SAP_PP_SBC_R; /SAPAPO/CL_RRP_SBC_PROC_AV; SAP_LEN_001N; /SAPAPO/CL_RRP_SBC_PROC_EOGL; , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , CA-ATP , Available to Promise (ATP) , Problem