SAP Knowledge Base Article - Preview

3785206 - IBP:Optimizer not respecting Maximum Lot size

Symptom

  • Optimizer not respecting the maximum lot size constraint.
  • Order quantity in orders (For example, planned order) exceeds maximum production lot size.
  • Trace message: "ignoring order max lot size value ... in optimizer."
  • Trace message: "Order split: lot sizes leading to impossible split (minLot = ..., maxLot = ...)."


Read more...

Environment

SAP Integrated Business Planning

Product

SAP Integrated Business Planning all versions

Keywords

optimizer, maximum lot size, minimum lot size, order split, planned order exceeds max, order-based planning, source of supply, lot size constraints, ibp optimizer, post-optimization split, impossible split, min greater than half max, production lot size, planned order quantity, lot size violation , KBA , SCM-IBP-RM-OPT , Order-Based Optimizer , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.