SAP Knowledge Base Article - Public

3786558 - APP Maintain Bill of Material(Version 2)/F1813A does not apply change master validity date when change number contains “/” - SAP S/4HANA Cloud Public Edition

Symptom

In Maintain Bill of Material (F1813A), using Edit with Change Number and assigning a change master whose number contains the character “/” does not update the BOM key date to the change master’s validity date. The key date remains at the BOM creation date instead of the change master validity date.

Environment

SAP S/4HANA Cloud Public Edition 2602

Reproducing the Issue

  1. In Manage Change Masters (F2212), create a change master with a validity date where the change number includes the character “/”.
  2. Open Maintain Bill of Material (F1813A) and choose Edit with Change Number for a BOM.
  3. Assign the created change number and observe that the key date remains the BOM creation date instead of the change master validity date.
  4. Repeat with a change number that does not include “/” and observe that the key date updates correctly to the change master validity date.

Cause

It is known issue.

Resolution

  1. Use a change number that does not contain the “/” character as a temporary workaround when editing BOMs with Edit with Change Number in F1813A.
  2. A correction is planned to be delivered with release 2608.3, targeted for mid-November 2026. Monitor release notes and update the system when the fix becomes available.

See Also

KBA 2825498 - Planned Maintenance Timelines for S/4HANA Public Cloud and Marketing Cloud System

Keywords

F1813A, Maintain Bill of Material, Edit with Change Number, change master, validity date not applied, BOM key date, forward slash, “/” character, special character, F2212, Manage Change Masters, CA02, BOM date not updated, S/4HANA Cloud Public Edition, public cloud , KBA , LO-MD-BOM-2CL , Bills of Material (Public Cloud) , Problem

Product

SAP S/4HANA Cloud Public Edition 2602