Symptom
- When loading multiple projects via the standard CNMASSCREATE template in a single run, only the first project is assigned Status Combination Code 13; subsequent projects receive Status Combination Code 0.
- WBS elements behave the same: those under the first project get code 13, while all others get 0.
- Table checks (for example, PROJ/PRPS) show code 13 for the first project/WBS elements and 0 for the rest.
Read more...
Environment
- SAP S/4HANA
- Work Breakdown Structure
Product
SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025 ; SAP S/4HANA Cloud Private Edition all versions
Keywords
CNMASSCREATE, CNMASSSTATUS, status combination, code 0, code 13, WBS, PROJ, PRPS, Project System, PS, mass upload, BAPI, status derivation, batch create, S/4HANA , KBA , PS-ST-MAS , Mass Change in the PS , PS-IS , Information System , PS , Project System , PS-ST , Structures , Problem