SAP Knowledge Base Article - Preview

3794866 - Ariba Fails to Synchronize In Joule Formation With SPII Status Report Deadline Exceeded Error

Symptom

  • The following error occurs while synchronizing the Joule Formation:
    • Errors occurred while synchronizing. Choose Resynchronize to restart the synchronization process. If the problem persists, report a case in the CA-JOULE-PRV component and provide the formation ID "the formation id" together with the following technical details: Synchronization between SAP Ariba Sourcing System and Joule System "system id" has failed'
    • In the Show technical error tab: 'System "the system id" returned a technical error for assignment with ID "the assignment id": "SPII status report deadline exceeded".'


Read more...

Environment

  • Business Technology Platform
  • Joule

Product

Joule 1.0

Keywords

formation synchronization, booster, spii status report deadline exceeded, integration with joule, synchronization failed, show technical error, ariba sourcing system, remove for consultants, exclude and re-include system, ca-joule-prv, provisioning, formation type, technical error, joule booster, formation , KBA , CA-JOULE-PRV , Provisioning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.