Symptom
After confirming a production order operation in T-Code CO11N, the backflushed component goods movements (movement type 261) are not posted immediately. Instead, they appear in T-Code COGI (Processing of Faulty Goods Movements) as failed entries. The production order confirmation was accepted without error, but the inventory balances are not updated. In T-Code MB52 or T-Code MMBE, the component stock is unchanged despite the confirmation. Over time, a large backlog of COGI entries accumulates and must be processed manually. The COGI error log shows messages such as M7 021 (insufficient stock), a posting period error, or an order status error. In the case of repetitive manufacturing (T-Code MFBF), the same behavior can occur when backflush postings fail.
Read more...
Environment
- SAP ERP Production Planning (PP)
- SAP ERP All versions
- SAP ERP Central Component All versions
- SAP R/3 All versions
- SAP R/3 Enterprise All versions
- SAP S/4HANA All versions
- SAP S/4HANA Cloud Private Edition All versions
- SAP enhancement package for SAP ERP All versions
- SAP enhancement package for SAP ERP, version for SAP HANA All versions
Product
Keywords
COGI, automatic goods movement, backflush error, CO11N, confirmation goods movement, movement type 261, M7 021, stock shortage COGI, posting period closed COGI, TECO blocks goods movement, CORUPROC, MFBF backflush, COGI reprocessing, COGI delete entry, MMRV prior period, MMPV period close, PP-SFC, COGI backlog, component goods issue error, production order goods movement failed , KBA , PP-SFC-EXE-GM , Goods Movements , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview