SAP Knowledge Base Article - Preview

3798436 - Production Order Created Without Operations or Routing

Symptom

After creating a production order in T-Code CO01 or converting a planned order to a production order in T-Code CO40 or T-Code MD15, the resulting production order has no operations. In T-Code CO03 (display production order), the Operations tab is empty. The following additional symptoms are observed:

  • All scheduling dates (basic start date, basic finish date, scheduled start, scheduled finish) are equal to the order creation date — no lead time is calculated.
  • In T-Code CM04 (capacity load overview) or T-Code CM01 (work center load), no capacity requirements are posted for the production order.
  • If a component is marked for backflush in the BOM or material master, no automatic goods movement (movement type 261) is triggered at confirmation because there are no operations to confirm.
  • In some cases, the system displays warning message CS 418 ("No routing found for material [X] in plant [Y]") during order creation and the user bypasses the warning.
  • The BOM is exploded correctly — components appear on the Components tab — but no routing/operations are attached.
  • In T-Code CO11N (operation confirmation), no operations are available to select for confirmation.


Read more...

Environment

  • SAP ERP Production Planning (PP)
  • SAP ERP All versions
  • SAP ERP Central Component All versions
  • SAP R/3 All versions
  • SAP R/3 Enterprise All versions
  • SAP S/4HANA All versions
  • SAP S/4HANA Cloud Private Edition All versions
  • SAP enhancement package for SAP ERP All versions
  • SAP enhancement package for SAP ERP, version for SAP HANA All versions

Product

SAP ERP Central Component all versions ; SAP ERP all versions ; SAP R/3 Enterprise all versions ; SAP R/3 all versions ; SAP S/4HANA Cloud Private Edition all versions ; SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

CO01 no operations, CO40 production order without routing, production order empty operations tab, routing not found, CS 418, task list not found, CA01 routing validity, production version routing reference, C223 production version, OPL8 routing selection, OPJG selection rule, CO02 update operations, COHV mass update, scheduling dates wrong, lead time not calculated, no capacity requirements, backflush no operations, CO03 operations empty, PP-SFC routing determination , KBA , PP-SFC-PLN-HEA , Header / Operation , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.