Symptom
In a standard cost estimate, production overhead is calculated and displayed individually at each sub-assembly or operation level within a multi-level BOM structure. The requirement is to display the total production overhead as a cumulative (rolled-up) value at the finished product level, rather than as separate line items at each lower-level component.
Read more...
Environment
- Controlling (CO)
- SAP ERP
- SAP ERP Central Component
- SAP enhancement package for SAP ERP
- SAP enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA
- SAP S/4HANA Finance
- SAP S/4HANA Cloud Private Edition
Product
Keywords
product costing, standard cost estimate, production overhead, overhead rollup, cumulative overhead, cost component split, costing sheet, overhead key, finished product, semi-finished material, multi-level BOM, CK13N, CK11N, CK40N, standard costing, overhead calculation, CO-PC-PCP , KBA , CO-PC-PCP , Product Cost Planning , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview