3800318 - Cumulative Production Overhead at Finished Product Level

Symptom

In a standard cost estimate, production overhead is calculated and displayed individually at each sub-assembly or operation level within a multi-level BOM structure. The requirement is to display the total production overhead as a cumulative (rolled-up) value at the finished product level, rather than as separate line items at each lower-level component. 


Read more...

Environment

  • Controlling (CO)
  • SAP ERP
  • SAP ERP Central Component
  • SAP enhancement package for SAP ERP
  • SAP enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA
  • SAP S/4HANA Finance
  • SAP S/4HANA Cloud Private Edition

Product

SAP ERP Central Component all versions ; SAP ERP all versions ; SAP Fiori for SAP S/4HANA Cloud Private Edition all versions ; SAP S/4HANA Finance all versions ; SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

product costing, standard cost estimate, production overhead, overhead rollup, cumulative overhead, cost component split, costing sheet, overhead key, finished product, semi-finished material, multi-level BOM, CK13N, CK11N, CK40N, standard costing, overhead calculation, CO-PC-PCP , KBA , CO-PC-PCP , Product Cost Planning , Problem