Symptom
- System upgrade using SUM cannot proceed during phase PREP_EXTRACT/SUMASK; the Passwords dialog is repeatedly shown and the phase is blocked.
- RFC login attempts for user DDIC fail during the validation step. In the phase log SUMASK.LOG, the following entries can be found.
1 ETQ359 RFC Login to: System="<SID>", AsHost="<hostname>" Nr="<NR>", Client="000", User="DDIC", GwHost="<hostname>", GwService="sapgw<NR>"
2WETQ231 RFC Login failed
4WETQ399 Dialogue validator 'DDICValidator' failed with 'DDIC password does not work:
4WETQ399XRFC login to system <SID> ashost <hostname> nr <NR> gwhost <hostname> gwservice sapgw<NR> failed with code 1 key RFC_COMMUNICATION_FAILURE: Timeout while opening an RFC connection..
4WETQ399X'.
Read more...
Environment
- SUM.
- SAP ABAP system lower than ABAP Platform 1809 (SAP_BASIS 7.53/SAP Kernel 773).
Product
SAP ERP all versions ; SAP NetWeaver Application Server for ABAP all versions ; SAP S/4HANA all versions ; SAP S/4HANA foundation all versions ; SAP enhancement package for SAP ERP all versions
Keywords
upgrade phase hang, RFC validator timeout, DDIC logon check, work process scheduling, WP reservation, parameter migration, kernel SP2 changes, dispatcher configuration, sumask log analysis, inbound RFC queue, dialog WP shortage, SUM validation step , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , BC-CST-DP , Dispatcher, Task Handler , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview