Symptom
When executing transaction KKAO (Calculate Work in Process – Collective Processing) with the WIP to Period set to a past period, production orders whose Basic Start Date and all actual postings fall in a subsequent period are still picked up by the selection.
- Message KJ364 is raised: "Customizing for WIP calculation: maintain status DLV and TECO."
- The affected orders carry active system statuses such as REL or PDLV — neither DLV nor TECO is set.
- These orders are evaluated in the WIP run despite having no actual postings within the selected period.
Read more...
Environment
- Controlling (CO)
- SAP ERP
- SAP ERP Central Component
- SAP enhancement package for SAP ERP
- SAP enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA
- SAP S/4HANA Finance
- SAP S/4HANA Cloud Private Edition
Product
Keywords
KKAO, KJ364, Work in Process, WIP Calculation, WIP to Period, Collective Processing, Production Orders, Basic Start Date, System Status, REL, PDLV, PREL, PCNF, DLV, TECO, RA Key, Results Analysis, Results Analysis Key, Valuation Methods, OKG3, OKGC, SAPKKA07, SE38, Order Selection, Posting Date Filter, Product Cost by Order, CO-PC, Controlling, Product Costing, S/4HANA , KBA , CO-PC-OBJ , Cost Object Controlling , CO-PC-OBJ-ORD , Product Cost by Order , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview