Symptom
- Freight Order with Packaging item (CHEP pallet) during EWM loading and PGI, a new standalone Freight Unit is created instead of updating the existing FU/package hierarchy.
- Assigning the newly created FU to the existing Freight Order leads to validation errors, such as: "Loading End for Item for item Product &1 is not possible. Warehouse processing status must be "Completed"" and "Statuses of items of req. doc. &1 do not match document execution status."
Read more...
Environment
SAP S/4HANA 1709 and Higher
Product
SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025
Keywords
generated packaging item, CHEP, pallet, freight unit, FU, item swap, FUBR, protected FU, loading appointment, ASR, RF loading, STO extension, transport relevance, BAdI CHANGE_TTRQ, delivery update, EWM integration, TM integration , KBA , TM-PLN-FU-FUB , Freight Unit Building , TM-INT-LI , Logistics Integration - General , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview