Symptom
While upgrading the BALDR in AMC, ./instabaldr script failed with below error messages:
Msg 17362, Level 16, State 1:
Server 'XXXXX', Procedure 'sp_changedbowner', Line 181:
The proposed new db owner already is a user in the database or owns the database. (return status = 1)
ERROR: Procedure cache is too low. Please increase the procedure cache size to at least 21000. (BALDR1007)
CT-LIBRARY error: ct_results(): network packet layer: internal net library error: Net-Library operation terminated due to disconnect.
Read more...
Environment
- SAP Adaptive Server Enterprise 16.0 SP04 PL08
- Linux OS
Product
Keywords
BALDR, AMC, Upgrade failed, Error 17362, procedure, cache issue , KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview