Symptom
• Running CURTOADV_CREATE (Absolute Transfer) for a configurable phantom assembly completes without errors, but the generated Production Data Structure (PDS) contains fewer components than the ERP BOM.
• The missing components are not flagged in any log or error message.
• The PDS result verified in /SAPAPO/CURTO_SIMU shows fewer components than expected from the BOM in transaction CS03.
• Components appearing correctly in CU50 simulation and in production orders created via CO01 are absent from the PDS.
• The affected components are flagged as bulk materials via the bulk indicator (field MARC-SCHGT) in the material master.
Read more...
Environment
SAP S/4HANA with ePPDS application
Product
Keywords
CURTOADV_CREATE, PDS, Production Data Structure, bulk material, bulk indicator, MARC-SCHGT, ePPDS, PPDS, phantom assembly, BOM transfer, /SAPAPO/CURTO_SIMU, CS03, missing components, Absolute Transfer, configurable BOM , KBA , SCM-APO-INT-MD-PDS , Production Data Structure , How To
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview