Symptom
- After setting an Alert Threshold for lateness to avoid surplus for Fixed Receipts in ePP/DS, no “Product too late” or “Product too early” alerts are generated.
- When an Alert Threshold is maintained, the calculation and determination of Product Alerts changes.
- In S/4HANA 2023, only alert thresholds were available to define pegging intervals and horizons. Maximum Earliness and Lateness in ePP/DS Material Maintenance was not available.
"Image / Data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental"
Read more...
Environment
- SAP S/4HANA with Embedded PP/DS
- Production Planning and Detailed Scheduling (PP/DS).
Product
SAP S/4HANA 2025
Keywords
PP/DS, alert threshold, lateness, earliness, product too late, product too early, avoid surpluses, avoid delays, heuristic, net requirements calculation, pegging interval, maximum earliness, maximum lateness, dynamic pegging, surplus receipts , KBA , SCM-APO-AMO , Alert Monitor , SCM-APO-PPS-HEU , Heuristics , SCM-APO-PPS , Production Planning and Detailed Scheduling , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview