SAP Knowledge Base Article - Preview

3814613 - Can the cancelled trip status be changed to Ticketed?

Symptom

A trip was booked in SAP Concur, but did not get approved in time, so it was auto-canceled changing the Trip Status to Withdrawn. The user contacted the TMC, which reinstated the trip in the same PNR and placed it onto the Report Queue. TMC would like to know why the Trip Status remains as Withdrawn and did not update to Ticketed.


Read more...

Environment

Travel > Reporting

Product

Concur Travel all versions

Keywords

Auto-canceled trip (or any library component which shows cancelled) was reinstated by the Travel Management Company (TMC) in the same PNR, however the Trip Status did not update from Withdrawn to Ticketed. , KBA , CON-SRV-TRV-SUP-PAC , PNR Acquisition , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.