Symptom
- Background job for program RFAWVZ40 runs significantly longer than expected and is cancelled.
- ABAP dump: Runtime Errors TIME_OUT with short text “Time limit exceeded”.
- ABAP dump: Runtime Errors DBSQL_SQL_ERROR (SQL code: -10807) while accessing table BSEG; error text “Connection down: [89006] System call 'recv' failed, rc=104: Connection reset by peer”.
- Termination occurs in routine GET_BKPF of include RFAWVZ40_F01N.
Read more...
Environment
- Financial Accounting (FI)
- SAP S/4HANA Finance
- SAP S/4HANA
Product
SAP S/4HANA Finance all versions ; SAP S/4HANA all versions
Keywords
RFAWVZ40, TIME_OUT, DBSQL_SQL_ERROR, SQL -10807, connection down, HANA, BSEG, GET_BKPF, RFAWVZ40_F01N, background job, performance, mass clearing, clearing documents, period-driven selection, posting date range , KBA , FI-GL-GL-G , Closing Operations / Period-End , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview