SAP Knowledge Base Article - Preview

3835268 - RFAWVZ40 background job runs long and cancels with TIME_OUT or DBSQL_SQL_ERROR — SAP S/4HANA

Symptom

  • Background job for program RFAWVZ40 runs significantly longer than expected and is cancelled.
  • ABAP dump: Runtime Errors TIME_OUT with short text “Time limit exceeded”.
  • ABAP dump: Runtime Errors DBSQL_SQL_ERROR (SQL code: -10807) while accessing table BSEG; error text “Connection down: [89006] System call 'recv' failed, rc=104: Connection reset by peer”.
  • Termination occurs in routine GET_BKPF of include RFAWVZ40_F01N.


Read more...

Environment

  • Financial Accounting (FI)
  • SAP S/4HANA Finance
  • SAP S/4HANA

Product

SAP S/4HANA Finance all versions ; SAP S/4HANA all versions

Keywords

RFAWVZ40, TIME_OUT, DBSQL_SQL_ERROR, SQL -10807, connection down, HANA, BSEG, GET_BKPF, RFAWVZ40_F01N, background job, performance, mass clearing, clearing documents, period-driven selection, posting date range , KBA , FI-GL-GL-G , Closing Operations / Period-End , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.