Symptom
• After re-exploding a production order from embedded PP/DS (EPPDS), the scrap quantity is calculated incorrectly.
• The system applies a higher scrap percentage than what is maintained in the material master in ECC side.
Read more...
Environment
- SAP S/4HANA
- Production Planning and Detailed Scheduling (PP/DS)
Product
SAP S/4HANA all versions
Keywords
ppds, eppds, re-explosion, scrap calculation, incorrect scrap percentage, order re-explode, normalize quantities, /SAPAPO/CULLRTOEXPL, production planning signal, pp ds scrap, material scrap mismatch, pds, APO scrap, S/4HANA manufacturing , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview