3837678 - Scrap quantity increases incorrectly after re-explosion of orders in PP/DS (EPPDS)

Symptom

• After re-exploding a production order from embedded PP/DS (EPPDS), the scrap quantity is calculated incorrectly.
• The system applies a higher scrap percentage than what is maintained in the material master in ECC side.


Read more...

Environment

  • SAP S/4HANA
  • Production Planning and Detailed Scheduling (PP/DS)

Product

SAP S/4HANA all versions

Keywords

ppds, eppds, re-explosion, scrap calculation, incorrect scrap percentage, order re-explode, normalize quantities, /SAPAPO/CULLRTOEXPL, production planning signal, pp ds scrap, material scrap mismatch, pds, APO scrap, S/4HANA manufacturing , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , Problem