Symptom
• The Scope Limitation field in the Advanced Planning view of the material master cannot be changed in transaction MM02.
• The field appears grayed out and is not editable.
• The issue occurs at the material-plant level when the Advanced Planning indicator is active or when existing dependencies are present for the material-plant combination.
• The expected behavior is that the Scope Limitation field is editable, allowing the user to define the planning scope for the material.
Read more...
Environment
- SAP S/4HANA
- Detailed Scheduling
- Production Planning and Detailed Scheduling (PP/DS)
Product
Keywords
Scope Limitation, Advanced Planning, material master, MM02, grayed out, PP/DS, MRP live, Advanced Planning indicator, S/4HANA, scope limit, material plant, manufacturing, Advanced Planning view, dependency, planning scope , KBA , SCM-APO-MD-PR , Product , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview