3838288 - Required maximum shelf life date not updated in product view when total shelf life is empty in material master

Symptom

• The 'Required Maximum Shelf Life Date' is not updated in the product view (/SAPAPO/MAT1).
• The 'Total Shelf Life' field is not maintained in the material master (MM02).
• At Goods Receipt, a new batch is created and the date of manufacture and SLED are entered manually based on supplier documents.
• The 'Planning with Shelf Life' flag is not set in the product master (/SAPAPO/MAT1).


Read more...

Environment

SAP S/4HANA

Product

SAP S/4HANA all versions

Keywords

Required Maximum Shelf Life Date, SLED, Shelf Life Expiration Date, Total Shelf Life, PP/DS Product View, Planning with Shelf Life, batch classification, material master, /SAPAPO/RRP3, /SAPAPO/MAT1, MM02, MSC2N, shelf life planning, LOBM_VFDAT, Goods Receipt , KBA , SCM-APO-PPS-SL , Shelf Life , Problem