3841658 - COGS split only triggers for the revaluation of consumption posted from material ledger.

Symptom

  • COGS split not generated for a material for original goods movement postings, but triggered afterwards for the revaluation of consumption postings from material ledger.
  • There's error displayed in Manage COGS Split: "No released cost estimate found for material" for the original goods movement postings.

Environment

 SAP S/4HANA Cloud Public Edition

Cause

No released cost estimate was found for the material on the relevant posting date, which prevents COGS split generation.
The revaluation of consumption posting triggers COGS split based on strategy (_SAP – Cost Component Split from Actual Costing ML).

The behaviour is not a bug — it is standard SAP logic. The COGS split is triggered via two different mechanisms, which explains why Strategy 1 succeeds in one case but not the other.

Case 1: ML Revaluation of Consumption (works) This runs as part of the Actual Costing period-end closing (Post Closing step in the ML Costing Cockpit). At that point, the system has already calculated the actual cost component data for the period. Strategy 1 (_SAP – Cost Component Split from Actual Costing ML) finds this data directly and the COGS split succeeds.

Case 2: Goods movement (fails). The COGS split is triggered outside the ML actual costing context. The system then evaluates the strategy sequence:

#

Strategy

Result

1

_SAP (Actual Costing ML)

No ML actual cost component data available for the current open period → falls through

2

_SA2 (Released Cost Estimate)

All cost estimates do not have status FR (released) → fails with error

3

_SA3 (Upcoming Released Cost Estimate)

 

 

Strategy 1 can in principle work for goods movements too — but only after the ML Actual Costing closing run (CKMLCP)  has been completed for the period. In an open period, the actual cost component data is not yet finalized, so Strategy 1 finds no valid basis and falls through to Strategy 2. Strategy 2 fails due to no released cost estimate (no FR status).

Resolution

Recommended Actions

  1. Fix the root cause: Resolve the costing errors (KF status) in the material cost estimates and release at least one valid estimate (FR status). This makes Strategy 2 functional as a fallback.
  2. Repost after fix: Once the cost estimate is released, use the app "Repost COGS Split" to retry the failed COGS split documents.

See Also

Keywords

cogs split, manage cogs split, repost cogs split, material cost estimate, no released cost estimate, cost estimate release, posting date validity, returns, sales invoice, s/4hana cloud public edition , KBA , CO-PA-2CL , Profitability Analysis (Public Cloud) , Problem

Product

SAP S/4HANA Cloud Public Edition all versions