SAP Knowledge Base Article - Preview

3843492 - Periodic consumption used for plausibility checks after program adjustment (MRR 11) causes implausible reads in Device Management

Symptom

  • Periodic consumption is used for plausibility checks after a meter program adjustment (meter read reason 11) instead of base period consumption.
  • The subsequent periodic meter read is deemed implausible and locked for billing.
  • This occurs when the configured periodic consumption was set to a lower value during installation and a program adjustment (MRR 11) is performed within the billing period.


Read more...

Environment

  • SAP for Utilities as Part of SAP ERP, release IS-UT 600 and higher.
  • SAP S/4HANA, release IS-UT 801 and higher.

Product

SAP ERP all versions ; SAP S/4HANA all versions

Keywords

periodic consumption, EL56, base period consumption, plausibility check, read reason 11, rr11, program adjustment, meter read implausible, locked for billing, device management, is-u, mro, register code update, dynamic period control, extrapolation, periodic mro , KBA , IS-U-DM-MR , Meter Readings , IS-U-DM-DI , Device Installation , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.