Symptom
- A Freight Unit (FU) is created and planned into a Freight Order (FO). It is then set to Ready for Warehouse Processing, and its Warehouse Processing status subsequently changes to "In Process".
- Meanwhile, another Freight Unit is created and planned into the same Freight Order. However, when attempting to set this second Freight Unit to Ready for Warehouse Processing through the Load or Unload Freight Order app (LUF), the following error is raised:
- /SCMTMS/OM 306 - Can't set to "Ready for Whse Proc." because of whse proc. status of &1.
- The error indicates that the Warehouse Processing status of the first Freight Unit prevents the system from setting the second Freight Unit to Ready for Warehouse Processing.
Read more...
Environment
SAP Transportation Management embedded in S/4HANA 2020 and subsequent releases.
Product
SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025
Keywords
Advanced Shipping and Receiving, ASR, Freight Unit, FU, Freight Order, FO, Warehouse Processing Status, Ready for Warehouse Processing, In Process, Not Started, /SCMTMS/OM306, Load or Unload Freight Order, LUF, Overview tab, /SCMTMS/IF_TOR_EP_CHECK~PERFORM_CHECK, /SCMTMS/CL_TOR_EPC_ROT_WHP_PR. , KBA , TM-FRM-ASR , Advanced Shipping and Receiving , TM-INT-LI-EWM , Adv.-SR-Based Integration with EWM , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview