SAP Knowledge Base Article - Preview

3846396 - Joule Formation Synchronization Fails with "Validation failure for context.operation: isInvalidOperation" When Editing Integration Details

Symptom

When attempting to edit integration details in an existing Joule formation (for example, selecting or deselecting "Enable the Joule Icon in the Integrated System"), the synchronization fails with the following error:
---------------------------------
Errors occurred while synchronizing. Choose Resynchronize to restart the synchronization process.
Synchronization between Joule System <Joule_System_ID> and SAP Build Work Zone System <BWZ_System_ID> has failed.
SAP Build Work Zone System <BWZ_System_ID> returned a technical error for assignment with ID <Assignment_ID>:
"Validation failure for context.operation: isInvalidOperation"
--------------------------------

Subsequent attempts to revert the change may also fail with:
Could not edit integration details. (Request ID: <Request_ID>)
The formation enters an error state and cannot be resynchronized.


Read more...

Environment

  • SAP Joule
  • SAP Build Work Zone

Product

Joule all versions

Keywords

Joule, formation, synchronization failure, Work Zone, Build Work Zone, isInvalidOperation, validation failure, enable Joule icon, integration details , KBA , CA-JOULE-PRV , Provisioning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.